Home
About
Projects
Blog
Certificates & Policies
Contact
Qued Athmania Water Treatment Plant (Phase 1)
Project Details
Location
Algeria
Year
Mar 2005 – Dec 2006
Consultant
Degremont
Scope Of Work
Design, Material Supply, Civil & Structural Works, Pipeline Construction
The water treatment plant contract was awarded to the
ENKA & Degremont (France) Consortium
. The scope of construction included:
Detailed design.
Material supply.
Civil and structural works for the treatment plant.
Leakage testing of all structures.
ENKA’s Share of Work:
Design, supply, erection, and start-up of the
raw water supply pipeline
.
The facility was designed with a
final operational capacity of 270,000 m³/day
of treated water.